Solutions By industry Energy, power & infrastructure
Legal AI for energy, power and infrastructure : For project legal teams working through long contracts, land and claims
A project is a stack of long contracts that depend on each other, land held by many owners, and claims that run for years. Here is where Jurisphere helps legal teams in power, renewables and infrastructure, and the firms that advise them.
- The same questions asked of every project contract
- Land records translated from 22 Indian languages
- ISO 27001 and SOC 2 Type 2
I want to identify the key terms of each lease, such as the start and end dates, rent and escalation, termination rights, lock-in and renewal.
“Jurisphere has been immensely helpful in reviewing complex multilingual tender documents with great accuracy.”
The documents you work with
Built around the papers a project runs on
- Tender and bid documents
- Concession agreements
- Power purchase agreements
- EPC contracts
- O&M agreements
- Land leases and sale deeds
- Right-of-way documents
- Regulatory orders
- Financing documents
- Claims and notices
Where the time goes
Where project legal work tends to slow down
-
Long contracts that depend on each other
The same handful of terms has to be found in every PPA, EPC and O&M agreement: tenure, termination, change in law, liquidated damages. Ask those questions of every contract and read the answers in one table, each cited to its clause.
AI due diligence -
Land held by many owners, in many languages
Project land comes with records and deeds in the language of each district. Jurisphere translates from 22 Indian languages into English, scanned pages included, with the numbering and formatting kept.
AI legal translation -
Claims that run for years
A delay or change-in-law claim is built from correspondence, notices and orders spread across the project's life. A List of Dates puts the record in order, with a page reference on every entry.
Disputes & litigation
Across a project
From the bid to operations
Where each part of the workspace comes in over the life of a project.
-
Bid and concession
- What takes time
- Reading tender documents and the draft concession for the terms that matter.
- With Jurisphere
- Questions answered from the documents, each pointing to its passage.
-
Land and approvals
- What takes time
- Land records and deeds in regional languages, some of them scanned.
- With Jurisphere
- English translations, checked side by side with the originals.
-
Project contracts
- What takes time
- Aligning the PPA, EPC and O&M terms with each other.
- With Jurisphere
- One table across the contracts, each answer cited to its clause.
-
Financing
- What takes time
- Lender diligence on the project company and its contracts.
- With Jurisphere
- The company's public MCA documents, and the contract set reviewed.
-
Construction and claims
- What takes time
- Putting years of correspondence and notices in order.
- With Jurisphere
- A List of Dates with a page reference on every entry.
-
Regulatory and disputes
- What takes time
- Reading orders and building the first draft of a petition or reply.
- With Jurisphere
- Research with the sources cited, and a formatted first draft.
Walkthrough
One clause, checked at its source
Every answer in a review table opens the full reasoning and the passage it came from, highlighted in the document beside it. A reviewer confirms the clause in seconds and moves to the next contract.
6. Lock-in Period. The Parties agree to a lock-in period of thirty-six (36) months from the Commencement Date (the “Lock-in Period”), during which neither Party shall terminate this Deed, save as provided in Clause 7.2.
7. Termination.
7.1After the expiry of the Lock-in Period, either Party may terminate this Deed by giving the other Party not less than six (6) months’ prior written notice, without assigning any reason.
7.2Notwithstanding Clause 6, if any Rent remains unpaid for more than sixty (60) days after its due date, the Lessor may terminate this Deed by giving the Lessee thirty (30) days’ written notice, unless the arrears are paid in full within that period.
7.3On termination or expiry, the Lessee shall hand over vacant and peaceful possession of the Premises to the Lessor, and the Lessor shall refund the Security Deposit within thirty (30) days, after deducting any amounts lawfully due under this Deed.
Either party may terminate after the lock-in on six months’ written notice (Clause 7.1). The Lessor may also terminate if rent stays unpaid for 60 days (Clause 7.2).
Once the lock-in period of 36 months from 1 January 2023 has run, either party may terminate the Lease by giving the other six months’ prior written notice, without assigning any reason. 1
If any rent remains unpaid for more than 60 days, the Lessor may terminate on 30 days’ written notice, unless the arrears are paid within that period. This right applies even during the lock-in. 2
Coverage
What research draws on
-
Courts and tribunals. The Supreme Court, every High Court (reported and unreported judgments), and tribunals including the NCLT, NCLAT and NGT.
-
Other jurisdictions. UAE, UK, US, EU, Canada, Singapore and Saudi Arabia sources alongside Indian law, for cross-border projects.
-
Your own documents. Attach contracts, regulatory orders and notices to any question. The answer points to the passage it relies on.
Who uses it
Built for everyone on a project
-
In-house legal teams
Contracts, regulatory questions and briefing outside counsel.
Enterprise legal teams -
Law firms
Research, review and drafting across a firm's matters.
Law firms -
Independent advocates
The whole brief on one desk, in chambers or solo practice.
Independent advocates
Security
Built for confidential legal work
The questions your IT and risk teams will ask, answered up front. Jurisphere is ISO 27001 certified and SOC 2 Type 2 compliant. Customer content is not used to train, fine-tune or improve any AI model. Content is held in memory only for as long as it takes to generate a response, and all customer content is encrypted in transit and at rest. Firms can also choose where their data is hosted, including deployment within their own cloud environment where required.
The detail is on our security page and in the trust centre.
-
ISO 27001 certified
Certified information security management.
-
SOC 2 Type 2 compliant
Controls audited against industry standards.
-
Not used for training
No customer content trains, fine-tunes or improves any model.
-
Encrypted throughout
In transit and at rest, and held in memory only while answering.
Questions teams ask before they start
Can Jurisphere review a full set of project contracts at once?
Yes. Parallel Review asks up to 50 questions of more than 1,000 documents and returns one table, with each answer cited to its clause.
Does Parallel Review compare one contract with another?
Each document is read on its own and answered question by question, so the table puts the answers side by side for you to compare. It does not decide for you which contract prevails.
Can Jurisphere work on a regulatory order we upload?
Yes. Attach the order to a question in Ask Juris. The answer is drawn from the order and points to the passage it relies on.
Does Jurisphere work with documents in Indian languages?
Yes. Translation turns documents in 22 Indian languages into English, including scanned pages, and reads handwriting in Hindi, Marathi and Kannada. The numbering and formatting are kept, and you can check the English against the original side by side.
Can I use Jurisphere on my own files, and what happens to them?
Yes. Upload the documents to your workspace and work on them there. Customer content is not used to train or improve any AI model, and it is encrypted in transit and at rest. Our security page sets out the detail.
Related reading
Bring one project. We will walk through it with you.
A 30-minute session with our team, on a contract set you choose. If Jurisphere is not the right fit yet, we will say so.